With a new runway under construction to handle the increased traffic for the 2008 Olympic Games, and parallel to the Capitol airport’s existing main runways, Beijing airport authorities opted for a multilateration system to provide continuous monitoring of the parallel runways when all were in simultaneous use. The multilateration parallel runway monitor is an extension of the airport’s mulitilateration-based A-SMGCS providing surface surveillance at the airport.


Beijing Airport